JiuJiang Group
Tangshan Iron Mine started construction and operation in 2018. Our company designs conveyor rollers and hydraulic bias regulators. The total length of the project is 1500 meters.
Date:2019-01-31
Tangshan Iron Mine started construction and operation in 2018. Our company designs conveyor rollers and hydraulic bias regulators. The total length of the project is 1500 meters.